{"id":1514,"date":"2021-12-16T12:00:00","date_gmt":"2021-12-16T15:00:00","guid":{"rendered":"https:\/\/bye.nexsa.cl\/barros-errazuriz-asesoro-a-austria-energy-en-la-asociacion-para-el-desarrollo-de-un-proyecto-de-hidrogeno-verde\/"},"modified":"2026-10-06T22:17:20","modified_gmt":"2026-10-07T01:17:20","slug":"barros-errazuriz-advised-austria-energy-in-the-partnership-for-the-development-of-a-green-hydrogen-project","status":"publish","type":"post","link":"https:\/\/www.bye.cl\/en\/barros-errazuriz-asesoro-a-austria-energy-en-la-asociacion-para-el-desarrollo-de-un-proyecto-de-hidrogeno-verde\/","title":{"rendered":"Barros &amp; Err\u00e1zuriz advised Austria Energy in the partnership for the development of a green hydrogen project"},"content":{"rendered":"<p>Advising Austria Energy in negotiating a partnership with \u00d6kowind and Copenhagen Infrastructure Partners for the joint development of an unprecedented scale project for the production of 100% renewable green hydrogen and green ammonia in the Magallanes Region, expected to be operational in 2025 and to avoid 2.3 million CO2.<\/p>\n<p>The project comprises the construction of a large-scale wind power plant, a water electrolysis desalination plant, an ammonia plant and a liquid hydrogen shipping port.<\/p>","protected":false},"excerpt":{"rendered":"<p>Advising Austria Energy in negotiating a partnership with \u00d6kowind and Copenhagen Infrastructure Partners for the joint development of an unprecedented scale project for the production of 100% renewable green hydrogen and green ammonia in the<\/p>","protected":false},"author":1,"featured_media":1515,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bye_card_image":1513,"_bye_lawyers":[247,240,533],"_bye_areas":[43,31,95,62],"_bye_document":0,"_bye_document_url":"","_bye_document_label":"","_bye_old_id":17717,"_bye_old_path":"\/barros-errazuriz-asesoro-a-austria-energy-en-la-asociacion-para-el-desarrollo-de-un-proyecto-de-hidrogeno-verde\/","_bye_translation":"https:\/\/backup-bye.nexsa.cl\/barros-errazuriz-advised-austria-energy-in-the-partnership-for-the-development-of-a-green-hydrogen-project\/?lang=en","footnotes":""},"categories":[1],"tags":[],"tipo_publicacion":[8],"industria":[27,45],"class_list":["post-1514","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"_links":{"self":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/posts\/1514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/comments?post=1514"}],"version-history":[{"count":0,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/posts\/1514\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/media\/1515"}],"wp:attachment":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/media?parent=1514"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/categories?post=1514"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/tags?post=1514"},{"taxonomy":"tipo_publicacion","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/tipo_publicacion?post=1514"},{"taxonomy":"industria","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/industria?post=1514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}