{"id":2774,"date":"2025-12-26T12:00:00","date_gmt":"2025-12-26T15:00:00","guid":{"rendered":"https:\/\/bye.nexsa.cl\/asesoria-a-banco-de-credito-e-inversiones\/"},"modified":"2026-10-06T22:17:22","modified_gmt":"2026-10-07T01:17:22","slug":"barros-errazuriz-advised","status":"publish","type":"post","link":"https:\/\/www.bye.cl\/en\/asesoria-a-banco-de-credito-e-inversiones\/","title":{"rendered":"Barros &amp; Err\u00e1zuriz advised Banco de Cr\u00e9dito e Inversiones (BCI)"},"content":{"rendered":"<p>Asesoramos a Banco de Cr\u00e9dito e Inversiones (BCI) en la estructuraci\u00f3n, redacci\u00f3n, negociaci\u00f3n y ejecuci\u00f3n de un contrato de cr\u00e9dito de Impuesto al Valor Agregado bajo ley chilena, destinado al financiamiento del IVA que ser\u00e1 pagado por GM Energy SpA una sociedad perteneciente al Grupo Generadora Metropolitana, en relaci\u00f3n con la construcci\u00f3n de un proyecto <em>greenfield<\/em> h\u00edbrido de generaci\u00f3n solar fotovoltaica y de un sistema de almacenamiento de bater\u00edas denominado \u201cProyecto Dune Plus\u201d, ubicado en Mar\u00eda Elena, en la Regi\u00f3n de Antofagasta, Chile. Asimismo, B&amp;E asesor\u00f3 en la redacci\u00f3n y en la negociaci\u00f3n de la dem\u00e1s documentaci\u00f3n requerida para el cierre del financiamiento, incluyendo las garant\u00edas de primer y segundo grado asociadas al financiamiento de IVA y otros documentos relacionados, as\u00ed como en la revisi\u00f3n de algunos documentos del cr\u00e9dito senior (incluyendo, entre otros, el <em>Credit Agreement<\/em>, el <em>Security and Depositary Agreement<\/em>, el <em>Intercreditor Agreement <\/em>y las garant\u00edas compartidas con el financiamiento de IVA<em>) <\/em>y su coordinaci\u00f3n con los documentos del cr\u00e9dito chileno.<\/p>\n<p>The Project consists of two sub-projects: (i) a 186-MWp solar photovoltaic plant coupled with a 175.5-MW (4-hour duration) battery energy storage system, and (ii) a 333.5-MW (4-hour duration) stand-alone battery energy storage system located within the site of GM Group\u2019s existing photovoltaic plant.<\/p>\n<p>El Proyecto fue estructurado bajo un esquema de <em>project finance<\/em> con financiamiento internacional y se sustenta en un contrato de compraventa de energ\u00eda el\u00e9ctrica de 15 a\u00f1os, bajo modalidad <em>take-or-pay<\/em>, pagadero en d\u00f3lares, celebrado con CODELCO, la empresa estatal chilena del cobre y una de las compa\u00f1\u00edas cupr\u00edferas m\u00e1s grandes del mundo. Adicionalmente, existen otros contratos de compraventa de energ\u00eda el\u00e9ctrica complementarios celebrados con otras entidades.<\/p>\n<p>The Project will be one of the largest hybrid solar photovoltaic and battery energy storage installations in Chile, delivering renewable energy to support CODELCO\u2019s operations and strengthen the national grid, consolidating the Project as one of the country\u2019s most emblematic energy-transition initiatives and positioning it as a leading reference in the development of next-generation energy infrastructure. It also represents a key milestone in GM Group\u2019s strategy to decarbonize its generation portfolio and advance Chile\u2019s transition toward a low-carbon power matrix.<\/p>","protected":false},"excerpt":{"rendered":"<p>B&amp;E advised Banco de Cr\u00e9dito e Inversiones (\u201cBCI\u201d) on the structuring, drafting, negotiation, and execution of a Value Added Tax credit agreement under Chilean law to finance the VAT to be paid by GM Energy<\/p>","protected":false},"author":1,"featured_media":2775,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bye_card_image":2773,"_bye_lawyers":[548,135,654,589],"_bye_areas":[19],"_bye_document":0,"_bye_document_url":"","_bye_document_label":"","_bye_old_id":28559,"_bye_old_path":"\/asesoria-a-banco-de-credito-e-inversiones\/","_bye_translation":"https:\/\/backup-bye.nexsa.cl\/barros-errazuriz-advised\/?lang=en","footnotes":""},"categories":[1],"tags":[],"tipo_publicacion":[8],"industria":[],"class_list":["post-2774","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"_links":{"self":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/posts\/2774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/comments?post=2774"}],"version-history":[{"count":0,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/posts\/2774\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/media\/2775"}],"wp:attachment":[{"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/media?parent=2774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/categories?post=2774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/tags?post=2774"},{"taxonomy":"tipo_publicacion","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/tipo_publicacion?post=2774"},{"taxonomy":"industria","embeddable":true,"href":"https:\/\/www.bye.cl\/en\/wp-json\/wp\/v2\/industria?post=2774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}