Barros & Errázuriz advised Sumitomo Mitsui Banking Corporation in the assignment of a part of its participation in the credit of the Local Senior Loan of the TEN Project’s, which consists of the construction of a trunk line of transmission of electricity of approximately 600 km in length, that connects the Central Interconnected System and the Interconnected System of the North of Chile.